Projects we done

Past Experience

Name Of Client Job Location Brief Description
Of Work Performed
Commencement
Date
Superin Chemical Pte Ltd. Singapore Labuan Port clearance & Immigration clearance 2004 – present
Petronas Chemicals Group, Malaysia Labuan Port clearance & Immigration clearance 2017 – present
Asahi Tanker Co., Ltd Labuan Port clearance & Immigration clearance 2017 – present
Shanghai Dong Zhan Shipping Co. Ltd, China Labuan Port clearance & Immigration clearance 2016 ‐ 2018
PT Buana Lintas Lautan (BULL) Tbk, Indonesia Labuan Port clearance & Immigration clearance 2016 ‐ 2018
Shin Yang Shipping Sdn Bhd, Malaysia Labuan Port clearance & Immigration clearance 2006 – 2008
Sojitz Marine & Engineering Corporation, Japan Labuan Port clearance & Immigration clearance 2007 – 2012
Sabah Foundation Labuan Port clearance & Immigration clearance 1996-2004
No Project Title/Project Brief Summary Client Contract/ Project  Duration
1 PEMBINAAN BANGUNAN MARKAS PANGKALAN, BASE COMMAND CONTROL CENTER (BCCC) DAN SKUADRON HANDAU DI PANGKALAN UDARA LABUAN JABATAN KERJA RAYA W. P. LABUAN 2024 – 2026
2 MALAYSIA TPS-77 LONG RANGE RADAR PROGRAM LOCKHEED MARTIN Feb – Sept 2023
3 KERJA-KERJA MENYELENGGARA DAN MENAIKTARAF PEPASANGAN PAPAN AGIHAN ELEKTRIK UTAMA SERTA KERJA-KERJA BERKAITAN DI RUMAH KOS SEDERHANA RENDAH TAMAN MUTIARA BLOK M PERBADANAN LABUAN June – Nov 2022
4 PROJEK PEMBINAAN INFRASTRUKTUR UNTUK PERPINDAHAN SKUADRON HAWK KE PANGKALAN UDARA TUDM LABUAN (JKR/IP/CKUB/163/2019) TUDM LABUAN/ JABATAN KERJA RAYA W. P. LABUAN Nov 2019 – Feb 2024
5 KERJA KERJA PEMBINAAAN SATU UNIT ARENA HALL DAN SATU UNIT MASJID DI KAWASAN TAPAK PERUMAHAN KAKITANGAN KERAJAAN DI KG BUKIT KUDA (SUBCONTRACTOR FOR RANCHA ENTERPRISE SDN BHD) JABATAN KERJA RAYA W.P. LABUAN 2007-2009
6 MEMBINA DA NMENYIAPKAN SEKOLAH AGAMA ISLAM KG BUKIT KALAM, W. P. LABUAN (SUBCONTRACTOR FOR RANCHA ENTERPRISE SDN BHD) JABATAN KERJA RAYA W.P. LABUAN 2007-2009
7 MEMBINA DAN MENYIAPKAN PERUMAHAN KASTAM KG BUKIT KUDA, W. P. LABUAN (SUBCONTRACTOR FOR RANCHA ENTERPRISE SDN BHD) JABATAN KERJA RAYA W.P. LABUAN 2004-2006
No Project Title/Project Brief Summary Client Contract/ Project  Duration
1 PROPOSED SUPPLY, DELIVERY AND INSTALLATION OF NEW WORKSTATION AND ASSOCIATED WORKS FOR PETRONAS FLOATING LNG 1 (I) LTD AT ASIAN SUPPLY BASE SDN BHD, LABUAN F. T. ASIAN SUPPLY BASE May – Jul 2024
2 PROVISION OF MINOR RENOVATION AND UPGRADING WORK AT CONTROL CENTRE BUILDING AND SCHEDULED WASTE YARD, PLANT 2, PC METHANOL PETRONAS CHEMICALS METHANOL SDN BHD Sept 2023 – Mar 2024
3 PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING (EPCC) OF PLANT 1 WASHING BAY AT PETRONAS CHEMICALS METHANOL SDN. BHD. PETRONAS CHEMICALS METHANOL SDN BHD Dec 2022 – June 2023
4 PROPOSED RENOVATION WORKS TO EXISTING OFFICE AND ASSOCIATED WORKS FOR SAPURA OMV UPSTREAM SARAWAK INC AT ASIAN SUPPLY BASE SDN BHD, LABUAN F. T. ASIAN SUPPLY BASE May – Aug 2024
5 PROVISION OF MAINTENANCE OFFICE PLANT 2 RENOVATION AT PETRONAS CHEMICALS METHANOL SDN BHD PETRONAS CHEMICALS METHANOL SDN BHD 2022
6 PROVISION OF FLOOR REPLACEMENT IN MULTIPURPOSE HALL AT PETRONAS CHEMICALS METHANOL SDN BHD. PETRONAS CHEMICALS METHANOL SDN BHD 2022
7 PROVISION OF BLASTING AND PAINTING SERVICES FOR PLANT 2 4TH TURNAROUND 2022 WELFIELD SERVICES SDN BHD 2022
8 PROVISION TO SUPPLY, DELIVER AND INSTALL OFFICE FURNITURE AND SOUNDPROOF PANEL AT CONTROL CENTRE (CCB) PETRONAS CHEMICALS METHANOL SDN BHD, PLANT 1 PETRONAS CHEMICALS METHANOL SDN BHD 2022
9 TO SUPPLY, INSTALL AND COMMISSION BOILER CHEMICAL DOSING ADDITIONAL ROUTING AND ACCESSORIES AT PETRONAS CHEMICALS METHANOL SDN BHD (PCMSB) PLANT 2 PETRONAS CHEMICALS METHANOL SDN BHD 2021
10 REFURBISHMENT OF BUILDING FACILITIES FOR LABUAN CRUDE OIL TERMINAL (LCOT) SEA HIBISCUS SDN BHD 2022
11 PROVISION OF MINOR RENOVATION AND UPGRADING WORK AT TSD OFFICE AND REJUVENATION OF CONTROL CENTRE BUILDING, CCB PLANT 2 PETRONAS CHEMICALS METHANOL SDN BHD 2021
12 PROVISION TO SUPPLY, DELIVER, LAY AND INSTALL LOW VOLTAGE CABLE EH-013009 AT PLANT 2, PETRONAS CHEMICALS METHANOL SDN BHD (PCMSB) PETRONAS CHEMICALS METHANOL SDN BHD 2021
13 PROVISION OF BLASTING AND PAINTING SERVICES FOR PLANT 1 17TH TURNAROUND 2021 WELFIELD SERVICES SDN BHD 2021
14 PROVISION OF SUPPLYING FURNITURE AND INSTALLATION OF NEW EXHAUST HOOD AND COMMERCIAL KITCHEN STOVE AT CANTEEN, PETRONAS CHEMICALS METHANOL SDN BHD PETRONAS CHEMICALS METHANOL SDN BHD 2020
15 PROVISION OF ENGINEERING, PROCUREMENT AND CONSTRUCTION OF SHED AND BUND WALL AT U-620 & U-900 PLANT 1 AT PETRONAS CHEMICALS METHANOL SDN BHD PETRONAS CHEMICALS METHANOL SDN BHD 2020
16 PROVISION OF NEW ROOF FOR GRT-2 CABIN AT PCMSB PLANT 2 PETRONAS CHEMICALS METHANOL SDN BHD 2019 – 2020
17 PROVISION FOR INSTALLATION OF BARB WIRE, COATED & FULLY GALVANIZED CHAIN LINK FENCING AND CONCRETING JOB AT PLANT 1 & 2 PETRONAS CHEMICALS METHANOL SDN BHD 2019 – 2020
18 PROVISION OF ENGINEERING, PROCUREMENT AND CONSTRUCTION OF CHEMICAL RESISTANCE BUND WALL FOR UNIT F-304 PETRONAS CHEMICALS METHANOL SDN BHD 2019 – 2020
19 PROVISION TO REMOVE TREE STUMPS, BOULDERS, SOIL FILLING, TO SUPPLY GEOTEXTILE FABRIC, GRAVEL AND TO PERFORM WORK AND LEVELING AT PCM. PETRONAS CHEMICALS METHANOL SDN BHD Aug-19
20 CONSTRUCTION OF CIVIL PACKAGES AT PETRONAS CHEMICALS FERTILIZER SABAH SDN BHD PETRONAS CHEMICALS FERTILIZER SABAH SDN BHD Dec-18
21 PROVISION TO CONSTRUCT NEW DARKROOM AT LABORATORY BUILDING, PCMSB, PLANT 1 PETRONAS CHEMICALS METHANOL SDN BHD Nov-18
22 CONSTRUCTION OF TURNAROUND VILLAGE FACILITIES INCLUDING ELECTRICAL WORK FOR PETRONAS CHEMICALS FERTILIZER SABAH SDN BHD PETRONAS CHEMICALS FERTILIZER SABAH SDN BHD Oct-18
23 PROVISION TO UPGRADE PERIMETER FENCING AT LABUAN GAS TERMINAL (LGAST) PETRONAS CARIGALI SDN BHD (LGAST) Feb – Sept 2016
24 ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) FOR THE INCOMING CABLE TRENCHING WATER TREATMENT PLANT – PLANT 2 PETRONAS CHEMICALS METHANOL SDN BHD. GENERAL ELECTRIC – WATER & PROCESS TECHNOLOGIES Jul 2015 – Sept 2015
25 ENGINEERING, PROCUREMENT & CONSTRUCTION FOR CIVIL WORK FOR FEED GAS PROJECT – CIVIL FOUNDATION FOR CONDENSATE HEATERS. PETRONAS CHEMICALS METHANOL SDN BHD Jun 2015 – Aug 2015
26 ENGINEERING, PROCUREMENT & CONSTRUCTION OF FINAL DISCHARGE POINT (FDP) UPGRADING WORK FOR PLANT 1 PC METHANOL PETRONAS CHEMICALS METHANOL SDN BHD Aug 2015 – Nov 2015
27 ENGINEERING, PROCUREMENT & CONSTRUCTION OF CHEMICAL RESISTANCE TRENCH FOR PLANT 1 U 500 PC METHANOL PETRONAS CHEMICALS METHANOL SDN BHD Jul 2014 – Oct 2015
28 ENGINEERING, PROCUREMENT & CONSTRUCTION OF CHEMICAL RESISTANCE BUND WALL FOR PLANT 2 CLAMTROL SKID INCLUSIVE OF SHELTER, LIGHTING & RELOCATE SIGNAGE WORKS. PETRONAS CHEMICALS METHANOL SDN BHD Sept 2014 – Jan 2015
29 REMOVAL AND REINSTALL ONE UNIT OF SS DOUBLE TRACK SLIDING GATE COME WITH REMOTE OPERATED MOTOR INCLUSIVE MATERIAL, MANPOWER, LIFTING EQUIPMENT AND TOOL. PETRONAS CHEMICALS METHANOL SDN BHD Nov 2014 – Jan 2015
30 UPGRADING OF GAS RECEIVING TERMINAL (GRT1) AT PCMSB COMPOUND – INCLUSIVE OF REMOVAL OF CHAIN LINK FENCE & GATE AND INSTALL NEW SS SLIDING GATE. PETRONAS CHEMICALS METHANOL SDN BHD May 2014 – Aug 2014
31 CONSTRUCTION, INSTALLATION, ERECTION, AND COMMISSIONING OF PDB MARINE LOADING ARM INCLUSIVE CIVIL AND STRUCTURAL WORKS. PETRONAS CHEMICALS METHANOL SDN BHD Mar 2014 – Aug 2014
32 PROCUREMENT AND CONSTRUCTION (PC) OF JETTY REINSTATEMENT & BERTH SERVICES INCLUSIVE OF ADDITIONAL WORK FOR THE REFURBISHMENT OF JETTY 1 PETRONAS CHEMICALS METHANOL SDN BHD Jul 2013 – Feb 2014
No Project Title/Project Brief Summary
Client Contract/ Project  Duration
1 TO CONSTRUCT ADDITIONAL CONCRETE SLAB AT SCRAP YARD PLANT 1 PETRONAS CHEMICALS METHANOL SDN BHD 2020
2 TO CONSTRUCT BLIND STORAGE AT WORKSHOP PLANT 2 PETRONAS CHEMICALS METHANOL SDN BHD 2020
3 SCHEDULE WASTE YARD IMPROVEMENT PROJECT – TO PERFORM ROADWAY MAINTENANCE TO SW YARD AT PLANT 1 PETRONAS CHEMICALS METHANOL SDN BHD 2020
4 CONSTRUCT CONCRETE SLAB FOR MULTIPURPOSE WALKWAY BESIDES GRT 2, PLANT 2 PETRONAS CHEMICALS METHANOL SDN BHD Mar-20
5 PROVISION TO REMOVE TREE STUMPS, BOULDERS, SOIL FILLING, TO SUPPLY GEOTEXTILE FABRIC, GRAVEL AND TO PERFORM WORK AND LEVELING AT PCM PETRONAS CHEMICALS METHANOL SDN BHD Aug-19
6 REPAIR RC SLAB AT WALKWAY PLANT 1 PETRONAS CHEMICALS METHANOL SDN BHD May-19
7 TO REPAIR AND APPLY WATERPROOFING ON GTG U900 BUILDING ROOFTOP PLANT 1 PETRONAS CHEMICALS METHANOL SDN BHD Feb-19
8 PERFORM REPAIR ON LOX BEARING HOUSING PETRONAS CHEMICALS METHANOL SDN BHD Dec-18
9 PROVISION OF ACCESS ROAD AND BUNDWALL L/S RECTIFICATION PETRONAS GAS BERHAD (SABAH OPERATION) SDN BHD PETRONAS GAS BERHAD (SABAH OPERATION) SDN BHD Jun-18
10 OFFICE RENOVATION FOR ELECTRICAL ROOM AND WAREHOUSE AT PLANT 1 FOR PETRONAS CHEMICALS METHANOL SDN. BHD. PETRONAS CHEMICALS METHANOL SDN BHD Dec-17
11 REMOVE, SUPPLY & INSTALL EXPLOSION DOOR PETRONAS CHEMICALS METHANOL SDN BHD Dec-17
12 SUPPLY AND DELIVER RACK FOR INSTRUMENT CABIN PETRONAS CARIGALI SDN BHD (LGAST) May-17
13 REMOVE AND INSTALL NEW TILES FOR ADMINISTRATION BUILDING – LGAST PETRONAS CARIGALI SDN BHD (LGAST) Mar-17
14 TO ERECT AND DISMANTLE OF TUBULAR TYPE SCAFFOLDING FOR LGAST PETRONAS CARIGALI SDN BHD (LGAST) Jan-17
15 FABRICATE, SUPPLY & INSTALL NEW NOTICE SIGNAGE (SASARAN PENTING) AT PERIMETER LGAST PETRONAS CARIGALI SDN BHD (LGAST) Jan-17
16 TO SUPPLY AND REPLACE CEILING BOARD AT CONTROL ROOM ADMINISTRATION BUILDING, LGAST PETRONAS CARIGALI SDN BHD (LGAST) Jan-17
17 TO CONSTRUCT RETAINING WALL AT SOIL EROSION AREA (STORM DRAIN NEAR FLARE STACK) PETRONAS CARIGALI SDN BHD (LGAST) Jan-17
18 TO FABRICATE, SUPPLY AND INSTALL ROAD FENDER AT PATROL ROAD, OLD CCR TO FLARE STAKE PETRONAS CARIGALI SDN BHD (LGAST) Jan-17
19 TO ERECT SCAFFOLDING FOR DCAP PETRONAS CHEMICALS METHANOL SDN BHD Mar-17
20 TO ERECT AND DISMANTLE SCAFFOLDING FOR U600 PETRONAS CHEMICALS METHANOL SDN BHD Jan-17
21 TREE TRIMMING & FELLING AT LGAST PROCESS & NON PROCESS AREA PETRONAS CARIGALI SDN BHD (LGAST) Dec-16
22 FABRICATE, SUPPLY & INSTALL 1 UNIT EMERGENCY GATE ACCESS BRIDGE DOOR PETRONAS CARIGALI SDN BHD (LGAST) Dec-16
23 FELL TREE, TREE TRIMMING & REMOVE OFFSITE PETRONAS CARIGALI SDN BHD (LGAST) Nov-16
24 TO SUPPLY, FABRICATE & INSTALL GYPSUM PETRONAS CARIGALI SDN BHD (LGAST) Nov-16
25 TO SUPPLY & CONSTRUCT NEW BUND WALL FOR BOOSTER COMPRESSOR, GTG SUMP PIT & NEAR GTG TANK (PMT 6311) PETRONAS CARIGALI SDN BHD (LGAST) Sep-16
26 TO CONSTRUCT NEW DRAIN FOR STAIRWAY AT ADMIN AREA PETRONAS CARIGALI SDN BHD (LGAST) Jun-16
27 EXCAVATION INCLUDING REMOVAL OF BEBRIS AND EARTH AND BACKFILL AT E 306 SLOP VESSEL SUSPECT LEAK PETRONAS CHEMICALS METHANOL SDN BHD Apr-16
28 TO CONSTRUCT CONCRETE DRAIN AND DRAIN PIPE AT SWITCHING VALVE ROOM PETRONAS CHEMICALS METHANOL SDN BHD Apr-16
29 TO SUPPLY & INSTALL WOODEN FLOOR, AWNING & SLIDING STEEL DOOR OUTSIDE GYM AREA PETRONAS CARIGALI SDN BHD (LGAST) Mar-16
30 TO FABRICATE & SUPPLY DCT CABINET AT ADMIN BUILDING PETRONAS CARIGALI SDN BHD (LGAST) Mar-16
31 TO SUPPLY AND INSTALL 24 NO. OF CONCRETE SLAB OF SIZE 600 MM X 600 MM X 75 MM PETRONAS CHEMICALS METHANOL SDN BHD Mar-16
32 TO SUPPLY AND INSTALL 24 NO. OF CONCRETE SLAB OF SIZE 600 MM X 780 MM X 125 MM PETRONAS CHEMICALS METHANOL SDN BHD Mar-16
33 TO CONSTRUCT NEW CONCRETE PAVING FOR NEW PORTA CABIN FOUNDATION AND MUSTERING POINT – LGAST PETRONAS CARIGALI SDN BHD (LGAST) Mar-16
34 TO CARRY OUT EXCAVATION WORK FOR UNDERGROUND PIPE LEAK AT U1300 PETRONAS CHEMICALS METHANOL SDN BHD Mar-16
35 TO SUPPLY, FABRICATE AND INSTALL A NEW METAL ROOF FOR 2 NO. GTG CONTAINER PETRONAS CHEMICALS METHANOL SDN BHD Mar-16
36 TO REPLACE DAMAGED SECURITY GATE AND REPAIR CHAIN LINK FENCE FOR JETTY 1 PETRONAS CHEMICALS METHANOL SDN BHD Mar-16
37 TO DO CONCRETE BREAKING AND REPAIR WORKS AT FH5 PETRONAS CHEMICALS METHANOL SDN BHD Mar-16
38 TO REPLACE OR REPAIR THE DAMAGED ROLLER SHUTTER IN SATELLITE WAREHOUSE PETRONAS CHEMICALS METHANOL SDN BHD Mar-16
39 FABRICATE, SUPPLY & INSTALL NEW ROOFING (SPANDEX) FROM AP GUARD HOUSE TO MUSTERING BOARD – LGAST PETRONAS CARIGALI SDN BHD (LGAST) Feb-16
40 FABRICATE, SUPPLY & INSTALL DOUBLE SWING GATE & STEEL STRUCTURE FOR BANNER – LGAST PETRONAS CARIGALI SDN BHD (LGAST) Feb-16
41 TO TOP UP GRAVEL PLANT AREA PETRONAS CHEMICALS METHANOL SDN BHD Feb-16
42 TO UNBLOCK, CLEAR WASTEWATER / OIL PIPELINE, REPLACE CONTAMINATED CRUSHED STONE & CONSTRUCT WALL TO RAISE THE WALL OF THE COLLECTION SUMP FOR THE WASTE OIL DISCHARGE PIPE – LGAST PETRONAS CARIGALI SDN BHD (LGAST) Aug-15
43 TO DO CIVIL (CONCRETE) REPAIR WORK USING GROUTING AT U 1300 PETRONAS CHEMICALS METHANOL SDN BHD Sept-15
44 ADDITIONAL WORK FOR UPGRADING OF GAS RECEIVING TERMINAL (GRT) COMPOUND – REMOVE AND REPLACE OF GRANITE STONE PETRONAS CHEMICALS METHANOL SDN BHD Sept-15
45 TO REPAIR CORRODED ROOF AT GTG CONTAINER (ELECTRICAL) PETRONAS CHEMICALS METHANOL SDN BHD Aug-15
46 TO DO CONCRETE (CEMENT) REPAIR FOR ALS AT U-300 EQUIPMENT FOUNDATION PETRONAS CARIGALI SDN BHD (LGAST) Aug-15
47 TO REPLACE DAMAGED GUTTER DRAIN PIPE (DOWNPIPE) AT U 1300 OFFSITE COMPRESSOR HOUSE BUILDING PETRONAS CHEMICALS METHANOL SDN BHD Aug – Sept 2015
48 REPAIR OF ICR BUILDING LEAKING ROOF PETRONAS CHEMICALS METHANOL SDN BHD April-15
49 FABRICATE , SUPPLY AND INSTALL OF STEEL METAL DOOR FOR STG BUILDING PETRONAS CHEMICALS METHANOL SDN BHD Dec 2014 – Mar 2015
50 REPAIR OF CENTRAL CONTROL ROOM (CCR) LEAKING ROOF – PLANT 1 PETRONAS CHEMICALS METHANOL SDN BHD Feb 2014 – June 2014
51 WATER PROOFING AT GTG ROOF PETRONAS CHEMICALS METHANOL SDN BHD Feb 2014 – Apr 2014
52 REPAIR OF LEAKING PIPE AT FIRE HYDRANT PETRONAS CARIGALI SDN BHD (LGAST) Jun 2014 – Nov 2014
53 REPAIR OF TRANSFORMER BUILDING LEAKING ROOF – PLANT 1 PETRONAS CHEMICALS METHANOL SDN BHD Feb 2014 – Apr 2014
54 CONSTRUCT CONCRETE WALK AWAY FROM MAIN ROAD TO GC ASU CABIN AT U-1300 – PLANT 2 PETRONAS CHEMICALS METHANOL SDN BHD (LGAST) Jul-14
55 TO REPLACE DAMAGED CHAIN LINK FENCE AT WORKSHOP – PLANT 2 PETRONAS CHEMICALS METHANOL SDN BHD Feb 2014 – June 2014
56 TO INSTALL 32 NO OF TURBINE VENTILATOR – MAC BUILDING PETRONAS CHEMICALS METHANOL SDN BHD May 2013 – Sept 2013
57 TO ERECT A SHELTER INCLUSIVE CIVIL & STEEL
STRUCTURAL WORK AT CHEMICAL WAREHOUSE – U500
PETRONAS CHEMICALS METHANOL SDN BHD Feb 2013 – Jul 2013
No Project Title/Project Brief Summary Client Contract/ Project Duration
1 TERM CONTRACT OF SUPPLY OF MANPOWER SUPPORT FOR PETRONAS CHEMICALS METHANOL SDN BHD DURING TURNAROUND WORK PETRONAS CHEMICALS METHANOL SDN BHD 2024 – 2026
2 TERM CONTRACT FOR MAINTENANCE SERVICES FOR ROTATING EQUIPMENT FOR PETRONAS CHEMICALS FERTILISER SABAH SDN BHD PETRONAS CHEMICALS FERTILISER SABAH SDN BHD 2023 – 2025
3 PROVISION OF GRASS CUTTING, LANDSCAPING AND ASSOCIATED SERVICES FOR PETRONAS CHEMICALS METHANOL SDN. BHD. PLANT 1 AND 2 (CONTRACT NO.: PSB/2022/PCMSB/CCA/TP-NI/1132) PETRONAS CHEMICALS METHANOL SDN BHD 2023 – 2026
4 PROVISION TO SUPPLY OFFICE FURNITURE AT PETRONAS CHEMICALS METHANOL SDN BHD (PCMSB) PLANT (CONTRACT NO: PSB/2022/PCMSB/CCGA/TP-NI/1031) PETRONAS CHEMICALS METHANOL SDN BHD 2022 – 2025
5 PROVISION OF MANPOWER FOR HSE OFFICER, TA TRAINER, MEDIC & LIFTING ENGINEER FOR TURNAROUND WORK FOR PETRONAS CHEMICALS METHANOL SDN. BHD. (CONTRACT NO.: SBH06-22015) PETRONAS CHEMICALS METHANOL SDN BHD 2022
6 PROVISION OF INFRASTRUCTURE SERVICES FOR LABUAN OPERATIONS (2021-2024) SEA HIBISCUS SDN BHD 2021 – 2025
7 TERM CONTRACT OF REMOVAL AND DISPOSAL OF SCRAP MATERIALS FOR PETRONAS CHEMICALS METHANOL SDN BHD PETRONAS CHEMICALS METHANOL SDN BHD 2020 – 2023
8 PRICE AGREEMENT FOR SUPPLY AND DELIVERY OF SODIUM HYPOCHLORITE FOR PETRONAS CHEMICALS METHANOL SDN BHD (2019—2022) PETRONAS CHEMICALS FERTILISER SABAH SDN BHD 2020 – 2022
9 TERM CONTRACT FOR MOORING BOAT AND MOORING GANG SERVICES TO PETRONAS CHEMICALS FERTILISER SABAH SDN BHD PETRONAS CHEMICALS FERTILISER SABAH SDN BHD 2019 – 2022
10 INTERIM CONTRACT FOR PROVISION OF BLASTING AND PAINTING SERVICES FOR PCMSB PETRONAS CHEMICALS FERTILISER SABAH SDN BHD 2019
11 INTERIM CONTRACT FOR CIVIL AND BUILDING MAINTENANCE SERVICES FOR PETRONAS CHEMICALS FERTILISER SABAH SDN. BHD – 2019 PETRONAS CHEMICALS FERTILISER SABAH SDN BHD 2019
12 PROVISION OF GRASS CUTTING AND GARDENING SERVICES FOR PETRONAS CARIGALI SDN BHD – PACKAGE A PETRONAS CARIGALI SDN BHD (SOGT) 2019 – 2021
13 TERM CONTRACT FOR SUPPLY OF MONTHLY NON-SCHEDULED WASTE DISPOSAL SERVICES AND SUPPLY OF OTHER NON-SCHEDULED WASTE AD-HOC SERVICES FOR PETRONAS CHEMICALS METHANOL SDN PETRONAS CHEMICALS METHANOL SDN BHD 2019 – 2022
14 TERM CONTRACT FOR MOORING BOAT AND MOORING GANG SERVICES TO PETRONAS CHEMICALS METHANOL SDN BHD (CONTRACT NO. SMSO/PCMSB/2016/0045) PETRONAS CHEMICALS METHANOL SDN BHD 2019 – 2021, 2016 – 2018, 2008 – 2016
15 PRICE AGREEMENT (PA) FOR THE PROVISION OF PAINTING SERVICES FOR PETRONAS CHEMICALS FERTILISER SABAH SDN BHD PETRONAS CHEMICALS FERTILISER SABAH SDN BHD 2017 – 2019
16 TERM CONTRACT FOR MOORING BOAT AND MOORING GANG SERVICES TO PETRONAS CHEMICALS FERTILISER SABAH SDN BHD PETRONAS CHEMICALS FERTILISER SABAH SDN BHD 2017 – 2019
17 PRICE AGREEMENT (PA) FOR THE PROVISION OF PAINTING SERVICES FOR PETRONAS CHEMICAL METHANOL SDN BHD (CONTRACT NO. SMSO/PCMSB/2016/0007) PETRONAS CHEMICALS METHANOL SDN BHD 2016 – 2019
18 PRICE AGREEMENT (PA) FOR PROVISION OF PLANT CIVIL WORK AND BUILDING MAINTENANCE FOR PETRONAS CHEMICALS METHANOL SDN BHD (CONTRACT NO. SMSO/PCMSB/2016/0073) PETRONAS CHEMICALS METHANOL SDN BHD 2016 – 2019
19 PRICE AGREEMENT (PA) FOR PROVISION OF GENERAL CIVIL AND MAINTENANCE SERVICES AT LABUAN GAS TERMINAL (LGAST) FOR PETRONAS CARIGALI SDN BHD (CONTRACT NO. SBO/2014/SPD/1004 (B) PETRONAS CARIGALI SDN BHD (LGAST) October 2014 – October 2017
20 PROVISION OF SUPPLY OF MONTHLY NON-SCHEDULE WASTE DISPOSAL SERVICES AND SUPPLY OF OTHER NON-SCHEDULE WASTE AD-HOC SERVICES FOR PETRONAS PETRONAS CHEMICALS METHANOL SDN BHD 2014 – 2016
21 PRICE AGREEMENT (PA) FOR THE PROVISION OF PAINTING SERVICES FOR PETRONAS CHEMICAL METHANOL SDN BHD (CONTRACT NO. SMSO/PCMSB/2013/0006) PETRONAS CHEMICALS METHANOL SDN BHD May 2013 – May 2017
22 PRICE AGREEMENT (PA) FOR PROVISION OF PLANT CIVIL WORK AND BUILDING MAINTENANCE FOR PETRONAS CHEMICALS METHANOL SDN BHD (CONTRACT NO. SMSO/PCMSB/2013/003) PETRONAS CHEMICALS METHANOL SDN BHD May 2013 – May 2016
23 TERM CONTRACT OF WAREHOUSE RENTAL FOR DOCUMENT STORE FOR PETRONAS CHEMICALS METHANOL SDN BHD PETRONAS CHEMICALS METHANOL SDN BHD 2013 – 2016
No Project Title/Project Brief Summary Client Contract/ Project Duration
1 TERM CONTRACT FOR GRASS CUTTING, HOUSEKEEPING AND LANDSCAPING SERVICES FOR PETRONAS CHEMICALS FERTILISER SABAH SDN. BHD. PETRONAS CHEMICALS FERTILISER SABAH SDN BHD 2024 – 2026
2 PEMBINAAN BANGUNAN MARKAS PANGKALAN, BASE COMMAND CONTROL CENTER (BCCC) DAN SKUADRON HANDAU DI PANGKALAN UDARA LABUAN JABATAN KERJA RAYA W. P. LABUAN 2024 – 2026
3 TERM CONTRACT OF SUPPLY OF MANPOWER SUPPORT FOR PETRONAS CHEMICALS METHANOL SDN BHD DURING TURNAROUND WORK PETRONAS CHEMICALS METHANOL SDN BHD 2024 – 2026
4 TERM CONTRACT FOR MAINTENANCE SERVICES FOR ROTATING EQUIPMENT FOR PETRONAS CHEMICALS FERTILISER SABAH SDN BHD PETRONAS CHEMICALS FERTILISER SABAH SDN BHD 2023 – 2025
5 PROVISION OF GRASS CUTTING, LANDSCAPING AND ASSOCIATED SERVICES FOR PETRONAS CHEMICALS METHANOL SDN. BHD. PLANT 1 AND 2 (CONTRACT NO.: PSB/2022/PCMSB/CCA/TP-NI/1132) PETRONAS CHEMICALS METHANOL SDN BHD 2023 – 2026
6 PROVISION TO SUPPLY OFFICE FURNITURE AT PETRONAS CHEMICALS METHANOL SDN BHD (PCMSB) PLANT (CONTRACT NO: PSB/2022/PCMSB/CCGA/TP-NI/1031) PETRONAS CHEMICALS METHANOL SDN BHD 2022 – 2025
7 PROVISION OF INFRASTRUCTURE SERVICES FOR LABUAN OPERATIONS (2021-2024) HIBISCUS MALAYSIA 2021 – 2025
8 SHIPPING & FORWARDING FOR PETRONAS METHANOL TANKER PETRONAS CHEMICALS METHANOL SDN BHD 2017 – 2030
9 TERM CONTRACT FOR MOORING BOAT AND MOORING GANG SERVICES FOR PETRONAS CHEMICALS FERTILISER SABAH SDN BHD PETRONAS CHEMICALS FERTILISER SABAH SDN BHD 2023 – 2026